EndCap being inserted into the LAr Cryostat. [May 2007]
The completed TRT barrel, with all services fully connected and tested,getting ready for cosmic tests in its final position in the ATLAS detector. [Nov. 2006]
After completion of the TRT installation.
Final cabling.
Guiding the SCT into the TRT.
Final Assembly of ATLAS SCT EndCap into TRT EndCap (11/06)